Bryan Cave HRO

i2 Construction was selected as the general contractor for the Bryan Cave LLP phased/occupied remodel after a prolonged design phase where numerous options, alternates, design features and schedules were evaluated. The 5-floor, 7-phase remodel was accomplished over a 39 week period utilizing “swing space” provided by the building owner. Working with a limited budget, the challenge was to upgrade a twelve year old design without breaking the bank. As shown in the photos, the team achieved their goals!